15吨导热油锅炉抢修工程项目,具体施工内容为锅炉高位槽钢平台支架加高7.5米及导热油支管道新增旁通管路。 Hualun Pisu (Suzhou) Co., Ltd. 15-ton heat-conducting oil boiler repair project, the specific construction content of the boiler elevated channel steel platform support heightened 7.5 meters and heat-conducting oil branch pipeline by-pass pipeline. As Hualun Pisu plans to provide two boilers (15-ton boiler and 20-ton boiler) for combustion in parallel to supply heat to the workshop, the high tanks of the two boilers must reach the same equilibrium height. Therefore, it is necessary to increase the height of the previous 15-ton boiler channel steel platform bracket by 7.5 meters.

The 15-ton boiler and its main pipeline of heat-conducting oil and the heat-conducting oil branch pipeline of the workshop production line require the addition of a bypass line, in order to reduce the production load of the 20-ton boiler and to better meet the environmental protection standards for flue gas emissions.

7天。 The total construction time for the two construction sub-projects is only 7 days. The project department consists of project manager You Xiaodong, technical director Zhang Jun, construction manager Zhai Jianliang and 10 construction team members. Due to the tight construction period, the project department is required to make detailed, detailed and comprehensive preparations in advance. The entire project department entered on March 6, and was successfully completed on March 12. At present, further observation is made on the stable value of boiler flue gas environmental protection emission standards.